The BOM Cost Review (BOM) report lists all the parts as loaded in a BOM. You can use this Costed Bill of Materials report to validate the contents of each assembly in a BOM along with supplier price information. This Costed BOM report is often part of the deliverables to the end customer when submitting a quote. The list of parts is ordered in the report starting from the top assemblies to the lower-level corresponding subassemblies or parts including alternate parts (AMLs).
Use the Reports dropdown in the top navigation bar to access the RFQ - BOM Cost Review Report. You can select the desired RFQ to review.
Only submitted RFQs will have the report and will be visible in the left-side filter panel. A scenario has to be applied in the RFQ for results to be displayed. With the report, you can:
- Filter by lines that are Awarded/Not Awarded.
- Export a detailed report for all BOMs in RFQ.
- Look at the High-level summary (With Actual Spend and Extended Unit Cost details).
- View Actual spend, which is calculated based on Unit Cost X* Quota/100 * Qty X.
- See Extended Unit Cost Details, which is calculated based on Unit Cost X * Quota /100 * Qty.
- Choose a certain BOM to see a detailed report.
- Look at “Part Intelligence” for every line item.